STAGE
5 - INTERIOR FABRICATION: frames and
watertight bulkheads are installed. Frames perform a dual purpose
as structural supports as well as providing the framework for storage
compartments.
The
fitting of bulkheads is directly linked to the boats buoyancy.
If any part of the hull is penetrated following a collision with
another ship or an obstacle floating in the water, only one of the
three sections that the boat is divided into will fill with water.
Enough time should then be afforded the crew to perform an emergency
hull repair - using special foam-sealed PVC sheets quickly stapled
to the outside - and bilge out the contents of the compromised section.
>>
BACK
|